The D&B H Job
Date Day Description In - Out T Hrs @ T labor Materials Payments Total Balance
06/26/12 tu Remove rotted wood at deck steps and house. 1-5 4 20 80 80 80
06/27/12 w Cut 2" space between steps section of deck and house siding 1-5 4 20 80 80 160
09/19/12 w Do slight flashing improvement at top of skylight.
Probe inside drywall and find it to be fubar.
1-5 4 20 80 80 240
09/20/12 th Pickup wood and build inside scaffold for ceiling.
Begin drywall removal find damage to be worse.
1-7 6 20 120 85 205 445
09/21/12 f Pick up some drywall and spackling, tear down all ceiling drywall, spray bleach. 2-6 4 20 80 75 155 600
09/25/12 t Dump drywall - 1 20 20 15 35 635
09/27/12 th Hose test skylight to find leaks,
loosen skylight for flashing repair, spray bleach
2-6 4 20 80 80 715
09/28/12 f pu more dw, hang dw 2-6 4 20 80 55 500 −365 350
10/02/12 t PU weatherstrip, finsh ceiling dw 3-6 3 20 60 20 80 430
10/03/12 w Scrape silicone , try new flashing, dw at skylihgt, tape 1-6 5 20 100 100 530
10/04/12 th block coat spackle 3/4 2-6 4 20 80 80 610
10/05/12 f finish block coat, some 3rd coat 1-3 2 20 40 500 −460 150
10/11/12 th drywall & corner bead on inside of skylight
opening, spackling
1-6 5 20 100 100 250
10/12/12 f skim coat 2-5 3 20 60 60 310
10/16/12 t skylight flashing - top half 1-7 6 20 120 120 430
10/17/12 w skylight flashing - bottom half 1-7 6 20 120 120 550
10/18/12 th skylight flashing - bottom half - clean glass 3-7 4 20 80 80 630
10/19/12 f Sand & paint & install skylight trim.
2nd coat pint, tear down scaffold
2-7 5 20 100 500 −400 230
10/16/02 s Vacume touch up spackle 2-3 1 20 20 20 250
10/24/12 w front center porch - dig out humus from foundation.
Begin raising sidewalk.
3-7 4 20 80 80 330
10/25/12 th PU 1/4 ton stonedust.
Continue lifting sidewalk to about 4".
Dig out trash. Point up gap in foundations (left).
Mix dirt/stone backfill and pack.
2-7 5 20 100 10 110 440
10/26/12 f PU 1/4 ton stonedust.
PU pvc pipe for downspout.
Pack dirt/stone under slabs.
Connect downspout to new pvc pipe.
2-7 5 20 100 40 140 580
11/06/12 t Raise end of another slab in sidewalk and pack. 3-6 3 20 60 60 640
11/07/12 w Lower othe end of same slab. 2-6 2 20 40 40 680
11/08/12 th Sand and paint touchup in sunroom. 2-6 2 20 40 500 −460 220
11/20/12 t Remove one row of decking and some joisthangers on walkway section. 1-5 4 20 80 80 300
11/21/12 w Finish romoving those hangers. 3-5 2 20 40 40 340
11/26/12 m Remove rimjoist at walk. 1-5 4 20 80 80 420
11/29/12 th Remove rotted siding at walk. 2-5 3 20 60 60 480
12/01/12 s Remove one row decking on main deck section. 2-5 3 20 60 60 540
12/03/12 m PU coil stock, bend rim flashing, denail that area. 2-5 3 20 60 80 140 680
12/04/12 t PU lumber & bolts, install 2pcs flashing. 1-5 4 20 80 85 165 845
12/05/12 w Finish flashing at walk, start j-hangers on new rim. 1-5 4 20 80 80 925
12/06/12 th PU Lumber & hangers, finish hangers on rim at walk. 1-5 4 20 80 90 170 1,095
12/08/12 s Cut and drill rim spacer blocks, start bolting. 3-5 2 20 40 40 1,135
12/11/12 t Pu 4-12" bolts and continue bolting on walk section. 2-5 3 20 60 20 80 1,215
12/12/12 w Temp support under big deck.
Begin removing joist hangers.
1-5 4 20 80 80 1,295
12/13/12 th Finish removing hangers.
Release and move deck away from house.
Remove rim joists and some siding.
12-5 5 20 100 100 1,395
12/14/12 f PU 4-1/2" bolts
Finish removing siding and nails.
Bend and begin installing flashing.
Payment ck# 7922
2-5 3 20 60 20 1000 −920 475
12/15/12 s Install flashing, rim joist, most joist hangers 2-6 4 20 80 80 555
20 0 0 555
20 0 0 555
20 0 0 555
03/17/13 w Pick up siding and 6x6, cut in 1 pc siding,
caulk all 3' door and 3 panel sliding door sills.
1-6 5 20 100 105 205 760
03/20/13 s PU dryer vent, caulk and bolts, caulk 2 panel slider,
install dryer vent
2-6 4 20 80 25 105 865
03/22/13 m jack up deck, replace end post with 6x6,
finish hoist hangers
1-6 5 20 100 100 965
03/23/13 t jack up deck and cut down 2 remaining 4x4 posts to
place bearing block on top and lower deck by 1-1/2".
2-6 4 20 80 80 1,045
03/24/13 w jack up fallen treehouse and place temporary support. 2-6 4 20 80 80 1,125
05/04/13 s repair siding 2-6 4 20 80 80 1,205
05/06/13 m PU more siding, finish most siding repair 1-5 4 20 80 20 100 1,305
06/01/13 s Install window sill flashings and trim, caulk window trim. 1-6 5 20 100 100 1,405
20 0 0 1,405
20 0 0 1,405
20 0 0 1,405
20 0 0 1,405
Totals to date: 3,660 745 3,000 1,405 1,405
Total Labor and Materials: 4,405
Total payments: 3,000
Balance Due: 1,405