| J&M L | ||||||||||
| Date | Day | Description | In – Out | T Hrs | @ | T labor | Materials | Payments | Total | Balance |
| 05/25/10 | t | Remove and set new side garage door | 3 – 7 | 4 | 20 | 80 | 80 | 80 | ||
| 05/26/10 | w | Remove MBR sliding glass door , find rotten wood temporarily set new door. | 3 – 7 | 4 | 20 | 80 | 80 | 160 | ||
| 05/27/10 | th | Repair rotten door sill and reset door. | 3 – 7 | 4 | 20 | 80 | 80 | 240 | ||
| 05/28/10 | f | Remove ant temp set LR S glass door. | 3 – 7 | 4 | 20 | 80 | 80 | 320 | ||
| 05/29/10 | s | Permanently set LR door. | 3 – 7 | 4 | 20 | 80 | 80 | 400 | ||
| 06/02/10 | w | Piece in foam sheathing around MBR and LR doors. | 3 – 6 | 3 | 20 | 60 | 60 | 460 | ||
| 06/03/10 | th | Remove Bsmt Door, find massive rotting in wall, make list and temporarily set new door. | 1 – 7 | 6 | 20 | 120 | 120 | 580 | ||
| 06/04/10 | f | Repair rotted framing and tmp-xet the door again. | 1 – 7 | 6 | 20 | 120 | 120 | 700 | ||
| 06/04/10 | f | Payment | 20 | 0 | 500 | -500 | 200 | |||
| 06/05/10 | s | Repair more framing, permanently set door , remove and close in 3' basement hall door. | 2 – 6 | 4 | 20 | 80 | 80 | 280 | ||
| 06/10/10 | th | Garage door brickmold | 6 – 7 | 1 | 20 | 20 | 20 | 300 | ||
| 06/11/10 | f | Repair more rotting at basement door beam. | 3 – 7 | 4 | 20 | 80 | 80 | 380 | ||
| 06/12/10 | s | Patch in foam and drywall at all doors. | 2 – 7 | 5 | 20 | 100 | 100 | 480 | ||
| 06/15/10 | t | Patch and first coat spackling at Hall , MBR, LR and BSMT. | 3 – 7 | 4 | 20 | 80 | 80 | 560 | ||
| 06/16/10 | w | Second coat spackling with ez-sand spackling. | 20 | 0 | 0 | 560 | ||||
| 06/18/10 | f | Cut brickmoulding | 3 – 6 | 3 | 20 | 60 | 60 | 620 | ||
| 06/22/10 | t | Spackle all , interior trim MBR | 3 – 6 | 3 | 20 | 60 | 60 | 680 | ||
| 06/22/10 | t | Payment | 100 | -100 | 580 | |||||
| 06/24/10 | th | Spackle all interior trim LR | 3 – 6 | 3 | 20 | 60 | 60 | 640 | ||
| 06/25/10 | f | Interior trim in basement | 3 – 6 | 3 | 20 | 60 | 60 | 700 | ||
| 06/26/10 | s | Interior trim in basement | 4 – 6 | 2 | 20 | 40 | 40 | 740 | ||
| 06/26/10 | s | 20 | 0 | 500 | -500 | 240 | ||||
| 07/30/10 | f | Remove decking MBR deck, clear rotted siding etc and replace with temporary flashing | 4 – 7 | 3 | 20 | 60 | 60 | 300 | ||
| 08/21/10 | s | Improve flashing and re-apply dicking | 4 – 7 | 3 | 20 | 60 | 60 | 360 | ||
| 10/06/10 | w | Start siding under deck at hot tub area – wall #8 (note that fladhing under deck is a pita) |
1 – 6 | 5 | 20 | 100 | 100 | 460 | ||
| 10/07/10 | th | Finish #8 move to #9 | 1 – 7 | 6 | 20 | 120 | 120 | 580 | ||
| 10/08/10 | f | Continue on wall #9 underdeck flashing | 1 – 6 | 5 | 20 | 100 | 100 | 680 | ||
| 10/09/10 | s | Finish #9 prep and window trim | 11 – 6 | 7 | 20 | 140 | 140 | 820 | ||
| 10/12/10 | t | Siding on #9 , Start left bottom w-sill replacemaent on wall #7 | 11 – 5 | 6 | 20 | 120 | 120 | 940 | ||
| 10/15/10 | f | Finish sill wood replacement move to flashing beam at wall #6 | 10 – 6 | 8 | 20 | 160 | 160 | 1100 | ||
| 10/16/10 | s | Siding and sliding door trim at walls 4,5 and 6 | 10 – 6 | 8 | 20 | 160 | 160 | 1260 | ||
| 10/19/10 | t | Move deck post and work on flashing that corner | 1 – 6 | 5 | 20 | 100 | 100 | 1360 | ||
| 10/20/10 | w | Finish setting that post Jeff finish siding. Move to wall #10 |
11 – 6 | 7 | 20 | 140 | 140 | 1500 | ||
| 10/21/10 | th | Wall #10: Sliding door trim and corner. | 11 – 6 | 7 | 20 | 140 | 140 | 1640 | ||
| 10/21/10 | th | Payment | 0 | 1000 | -1000 | 640 | ||||
| 10/22/10 | f | Wall #10: Set right corner, set up scaffolding, set second j-channel / zstrip level |
11 – 6 | 7 | 20 | 140 | 140 | 780 | ||
| 10/23/10 | s | Wall #10: Fix pvc primer-stained siding (-2hrs), Start window trim. |
1 – 6 | 5 | 20 | 100 | 100 | 880 | ||
| 10/26/10 | t | #10: Finish bathroom window trim | 12 – 6 | 6 | 20 | 120 | 120 | 1000 | ||
| 10/26/10 | t | set of snips and tape for Jeff | 35 | 35 | 1035 | |||||
| 10/27/10 | w | #10: Right center siding, start soffit & top siding, Rain |
12 – 4 | 4 | 20 | 80 | 80 | 1115 | ||
| 10/28/10 | th | #10: Finish right top siding, facia and soffit, light | 11 – 6 | 7 | 20 | 140 | 140 | 1255 | ||
| 10/29/10 | f | #10: Move right center siding to align with bottom, move scaffold to left side, do corner & center siding., |
11 – 6 | 7 | 20 | 140 | 140 | 1395 | ||
| 10/30/10 | s | #10 Finish siding, soffit and facia! | 11 – 4 | 5 | 20 | 100 | 100 | 1495 | ||
| 10/30/10 | s | Payment: ck #183 - $1000 , cash - $50 | 20 | 0 | 1050 | -1050 | 445 | |||
| 11/02/10 | t | Wall #9 above deck – set up scaffold, remove gutter & facia, rip wood facia straight. |
11 – 5 | 6 | 20 | 120 | 120 | 565 | ||
| 11/03/10 | w | # 9: Install styrovent above insulation in eaves, straighten facia in&out, run soffit |
12 – 6 | 6 | 20 | 120 | 120 | 685 | ||
| 11/05/10 | f | #9: bend and install alum facia, | 2 – 6 | 4 | 20 | 80 | 80 | 765 | ||
| 11/06/10 | s | #8: setup scaffold, remove gutter soffit and facia | 12 – 4 | 4 | 20 | 80 | 80 | 845 | ||
| 11/09/10 | t | #8: Cut back roof shingles at eave to accomodate Step flashing |
11 – 5 | 6 | 20 | 120 | 120 | 965 | ||
| 11/10/10 | w | styrovent and sheathing | 20 | 0 | 70 | 70 | 1035 | |||
| 11/10/10 | w | #8: install styrofoam sheathing under eave, install soffit |
11 – 5 | 6 | 20 | 120 | 120 | 1155 | ||
| 011/12/2010 | w | Inside corner and Jchannel on wall #8 at roof. Cover facia. | 12 – 4 | 4 | 20 | 80 | 80 | 1235 | ||
| 011/12/2010 | w | Pmt Ck #183 | 20 | 0 | 1000 | -1000 | 235 | |||
| 11/17/10 | w | #8 Outside corner. Rip and install base. |
1 – 5 | 4 | 20 | 80 | 80 | 315 | ||
| 11/29/10 | s | Cover base. Caulk |
1 – 4 | 3 | 20 | 60 | 60 | 375 | ||
| 12/11/10 | s | Cover trim on windows. | 2 – 5 | 3 | 20 | 60 | 60 | 435 | ||
| 12/11/10 | s | Pmt cash | 20 | 0 | 100 | -100 | 335 | |||
| 12/18/12 | s | Finish trim on windows and sliding door. | 1 – 5 | 4 | 20 | 80 | 80 | 415 | ||
| 12/18/12 | s | Pmt cash | 20 | 0 | 100 | -100 | 315 | |||
| Winter break! | 20 | 0 | 0 | 315 | ||||||
| 04/20/11 | w | Jbead around #9 windows and sdooor. Start field siding , and downspout. |
12 – 5 | 5 | 20 | 100 | 100 | 415 | ||
| 04/21/11 | th | Finish #9 siding. #9 downspout. Move to #8 siding. |
1 – 5 | 4 | 20 | 80 | 80 | 495 | ||
| 04/21/11 | th | Payment: ck # 1707 | 0 | 500 | -500 | -5 | ||||
| 04/26/11 | t | Siding at top of #8. Finish #9 downspout. Remove base at #7 and start corner at #5-6. |
11 – 5 | 5 | 20 | 100 | 100 | 95 | ||
| 04/27/11 | w | Remove / Install base at #4,5,6. Start to cover. Install corner. #6 s-door trim. |
11 – 5 | 5 | 20 | 100 | 100 | 195 | ||
| 04/28/11 | th | jury duty – 2 days | 20 | 0 | 0 | 195 | ||||
| 05/03/11 | t | Set up scaffold @ #6. Remove soffit. Install foam sheathing. |
11 – 5 | 5 | 20 | 100 | 100 | 295 | ||
| 05/05/11 | th | S-door sill kick. Install and cover base at $6,7&8. |
11 – 5 | 5 | 20 | 100 | 100 | 395 | ||
| 05/06/11 | f | Remove soffit at #6&7 & Install soffit at #8. #5 window sills.. |
11 – 5 | 5 | 20 | 100 | 100 | 495 | ||
| 05/06/11 | f | Payment: ck # 1710 | 20 | 0 | 500 | -500 | -5 | |||
| 05/07/11 | s | #4 corner & siding (move recepticle). Cut shingles around #6 facia and soffits. |
11 – 5 | 5 | 20 | 100 | 100 | 95 | ||
| 05/10/11 | t | #5 Window trim. #4 soffit. |
11 – 5 | 5 | 20 | 100 | 100 | 195 | ||
| 05/11/11 | w | #5 window trim & soffit & siding. #6 j bead at #5 and roof, |
11 – 6 | 6 | 20 | 120 | 120 | 315 | ||
| 05/12/11 | th | #6 siding and facia. | 11 – 5 | 5 | 20 | 100 | 100 | 415 | ||
| 05/13/11 | f | Facia on #4&5. Gutters on #4,5&6. |
11 – 5 | 5 | 20 | 100 | 100 | 515 | ||
| 05/13/11 | f | Payment: ck # 1711 | 20 | 0 | 500 | -500 | 15 | |||
| 05/18/11 | w | Rain – move break to garage. Make #3 door trim |
2 – 4 | 2 | 20 | 40 | 40 | 55 | ||
| 05/21/11 | s | Cover picture window and side door trim on #3 | 12 – 5 | 5 | 20 | 100 | 100 | 155 | ||
| 05/24/11 | t | #3 Bottom z-strip, corner, and under-deck z-strip. | 11 – 5 | 5 | 20 | 100 | 100 | 255 | ||
| 05/25/11 | w | #3 Cut back deck railing and soffit and install upper corner. |
11 – 5 | 5 | 20 | 100 | 100 | 355 | ||
| 05/26/11 | th | #3 Figure out how to treat upper double casement. | 12 – 5 | 4 | 20 | 80 | 80 | 435 | ||
| 05/27/11 | f | #3 Finish a trial run on wrapping the casement But wind up with some binding.... Jeff meter panel and siding |
12 – 6 | 5 | 20 | 100 | 100 | 535 | ||
| 05/27/11 | f | Payment: ck # 1712 | 20 | 0 | 500 | -500 | 35 | |||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 | |||||||
| 20 | 0 | 0 | 35 |